Production Checklist
Complete checklist for deploying BroxiAI applications to production
Ensure your BroxiAI application is production-ready with this comprehensive checklist covering security, performance, monitoring, and operational requirements.
Pre-Deployment Planning
Requirements Analysis
Functional Requirements
Non-Functional Requirements
Performance Targets:
- Response time: p95 < 3 seconds
- Throughput: 100+ concurrent users
- Availability: 99.9% uptime
- Error rate: < 1%
Scalability Requirements:
- Initial capacity: 1,000 users
- Growth projection: 10x in 12 months
- Peak load handling: 5x normal load
- Geographic distribution: 3 regionsCompliance Requirements
Security Checklist
Authentication & Authorization
User Authentication
API Security
Data Protection
Security Configuration
Network Security
Vulnerability Management
Infrastructure Checklist
Environment Setup
Production Environment
Network Configuration
Database Configuration
Production Database
Vector Database Setup
Application Configuration
BroxiAI Workflow Setup
Workflow Configuration
Model Configuration
Integration Configuration
External Services
Third-Party Integrations
Performance Optimization
Application Performance
Response Time Optimization
Resource Optimization
Scalability Preparation
Auto-Scaling Configuration
Load Testing Results
Monitoring & Observability
Monitoring Setup
Application Monitoring
Business Metrics
Alerting Configuration
Alert Categories
Notification Channels
Backup & Disaster Recovery
Backup Strategy
Data Backup
Backup Testing
Disaster Recovery Plan
Recovery Procedures
DR Testing
Deployment Process
Deployment Pipeline
CI/CD Configuration
Deployment Strategy
Pre-Deployment Testing
Testing Checklist
Environment Validation
Go-Live Preparation
Team Readiness
Team Training
Documentation
Communication Plan
Stakeholder Communication
User Communication
Post-Deployment Verification
Immediate Checks (0-2 hours)
System Health
Functionality Verification
Short-term Monitoring (2-24 hours)
Performance Monitoring
Long-term Validation (1-7 days)
Trend Analysis
Incident Response Preparation
Incident Management
Response Team
Response Procedures
Compliance & Governance
Regulatory Compliance
Data Protection
Audit Requirements
Quality Assurance
Code Quality
Process Quality
Final Go-Live Authorization
Sign-off Checklist
Technical Sign-off
Business Sign-off
Launch Decision
Go/No-Go Criteria
Post-Launch Activities
Immediate Actions (Day 1)
Monitoring and Support
Short-term Actions (Week 1)
Optimization and Improvement
Long-term Actions (Month 1)
Review and Planning
Checklist Summary
Critical Path Items
Security Configuration - Non-negotiable security requirements
Performance Validation - Meeting performance targets
Monitoring Setup - Comprehensive observability
Backup & Recovery - Data protection and business continuity
Team Readiness - Operational capability and support
Success Metrics
Zero critical security vulnerabilities
Performance targets met consistently
Monitoring alerts functioning correctly
Backup and recovery procedures tested
Team trained and documentation complete
This checklist should be customized for your specific deployment requirements. Not all items may apply to every deployment, and additional items may be needed based on your industry and compliance requirements.
A thorough pre-deployment checklist significantly reduces production issues and ensures a smooth launch. Take time to validate each item before proceeding to production.
Last updated